ALPAMARE WATER PARK
The Sands, Scarborough
Client: | Alpamare |
Main Contractor: | Tolent |
Sector: | Leisure |
Steel: | 250 te |
Completed: | 2015 – 2016 |
Location: | Scarborough |
Scope: | Structural Steelwork |
Services: | Detailing Connection Design Fabrication Site Installation |
Keywords: |
Hot Dip Galvanising Macalloy Tension Rods Cellular Beams Curved Steel |
Project Summary
We undertook the construction of a new water park, comprising an Amenity building, Pool Hall, and Flume Tower.
Our fabrication of the primary steelwork included all rafters, nine curved cellular beams at 26 metres long, Macalloy tension rods bracings, and cold rolled cladding support rails.
Phase 1 of the site installation works commended with the Amenity building, while Phase 2 works commenced on the South of the main Pool Hall building. We fabricated steelwork with temporary lifting eyes, to avoid causing on-site damage to the galvanising during the installation process.
We also provided the lifting and positioning of precast concrete staircase units, supplied by others.