LHR Q6 BAGGAGE HBS & ASSET REPLACEMENT

Heathrow Airport Terminal 4
Client: HAL
Main Contractor: BEUMER 
Sector: Aviation
Steel: 240 te
Completed: Live
Location: London
Scope: Structural Steelwork
Ancillaries
Services: Detailing
Connection Design
Fabrication
Site Installation
Keywords:

Offsite Painting
Open Grid Flooring
Durbar Plate
Handrail
Cat Ladders
Safety Gates
Temporary Works
Lifting Beams

Project Summary

The objective of the Heathrow Airport Limited Q6 Lot 1 Baggage Handling System Services in Terminal 4 project is to replace or re-life existing baggage assets to maintain the baseline capacity of the current baggage systems. The project also aims to further ensure provision of suitable manual handling aids and compliance with Health and Safety Executive legislation.

In summary, our scope include the supply, fabrication, and installation of new mezzanine platforms to support the new baggage system.

The first phase of the works comprises the removal of existing platform steel and ancillaries, followed by the installation of new Phase 9 platform steelwork including all ancillaries, steel stairs, and lifting beams.