FUJIFILM H4 DEWAR STORE & PROJECT GRIFFIN
Replacement Dewar Store
Client: | FUJIFILM Diosynth Biotechnologies |
Main Contractor: | FUJIFILM / Hightown Group |
Sector | Industrial |
Steel: | 100 te |
Completed: | 2021 – 2022 |
Location: | Billingham |
Scope: | Civils Concrete slab & foundations Structural Steelwork Cladding Steel doors Mesh partitions Metalwork Ancillaries Handrail Open grid flooring Steel stairs |
Services: | Structural design Detailing Connection design Fabrication Site installation |
Project Summary
Our scope primarily comprised of a new storage building – a single storey portal-framed standalone structure, of approximately 16.5m x 7.5m.
The client identified a location for the proposed Dewar store facility within an enclosed area between existing buildings at their Billingham site.
Following completion of our steelwork installation, we further coordinated the supply and installation of the full cladding package including steel doors and internal mesh cage partitions.