LIANHETECH LC900 TANK FARM

Pipe Racks, Access, and Cable Tray Supports
Client: Lianhetech
Main Contractor: Addison Project
Sector: Industrial/Engineering
Steel: 120 te
Completed: 2020 – 2021
Location: Teesside
Scope: Structural Steelwork
Metalwork
Services: Detailing
Connection Design
Fabrication
Site Installation
Keywords:

Open Grid Flooring
Galvanised Handrail
Steel Stairs
Cat Ladders
Hot Dip Galvanising

Project Background

Our scope briefly included the supply and install of freestanding structures at the live site:

West Piperack: a 15-metre long structure, three levels.

East Piperack: a 15-metre long structure, three levels.

Platforms (various): including access platforms, steam let-down platforms, loading bay platforms, and support frames, located across the site and all complete with metalwork ancillaries.

Piperack PL04: a smaller, 11-metre long pipe rack, three levels.

Piperack PL05: a 12-metre long piperack connector between two existing structures.

Cable Tray Support PL09-PL10: a 25-metre long, two level, support structure spanning between two existing pipe racks.

Miscellaneous Pipe Supports: c.100 individual SPS supports located across the site, including inside the existing MPB3 building to all four levels.

We fully utilised our fabrication workshop to preassemble as many of the structures as possible, to reduce the site programme on the live site.