Heathrow Airport Q6 T4 Baggage Hall Upgrade Works

Main Contractor: BEUMER UK
Sector: Industrial
Steel: 250 te
Location: London
Programme: 2018 – 2021

National Grid – Huntingdon Compressor Station Upgrade

Main Contractor: Ledwood
Sector: Industrial
Steel: 200 te
Location: Huntingdon
Programme: 2019 – 2020

Lianhetech LC900 – Warehouse ‘D’ Extension

Main Contractor: Addison Project
Sector: Industrial
Steel: 40 te
Location: Middlesbrough
Completed: 2020

Birmingham Airport TE18 Expansion Phase 1 – VCC

Main Contractor: Mace
Sector: Aviation
Steel: 100 te
Location: Birmingham
Completed: 2019 – 2020

Chemoxy / SEQENS
Billingham Plant 5.1

Main Contractor: SEQENS
Sector: Industrial
Steel: 120 te
Location: Billingham
Completed: 2019

Mochdre Biomass Ltd NB4 / Blazer Fuels, Ruthin

Main Contractor: Padd Energy
Sector: Power Generation
Steel: 100 te
Location: Ruthin, Wales
Completed: 2019

Teesside Biomass /
Teesside Renewable Energy

Main Contractor: Lagan / BWV
Sector: Power Generation
Steel: 2,500 te
Location: Teesside
Completed: 2016 – 2019

Scottish Fire & Rescue Service – Training Facility

Main Contractor: Draeger Safety
Sector: Civic and Public
Steel: 100 te
Location: Edinburgh
Completed: 2018 – 2019

Stansted Airport
Baggage Handling Upgrade

Main Contractor: BEUMER UK
Sector: Aviation
Steel: 390 te
Location: London
Completed: 2018

Heathrow Terminal 3 –
Permanent Flight Connection Centre (FCC)

Main Contractor: Mace
Sector: Aviation
Steel: 1,000 te
Location: London
Completed: 2016 – 2018

Margam Biomass/
Margam Renewable Energy Plant

Main Contractor: BWV
Sector: Power Generation
Steel: 200 te
Location: Port Talbot
Completed: 2016 – 2018

Heathrow Terminal 3
Pier 7 Asset Replacement – Roof Main Works

Main Contractor: Mace Ltd
Sector: Aviation
Steel: 225 te
Location: London
Completed: 2016

Bradford Royal Infirmary – Ward Block 2 & Critical Care Unit (CCU)

Main Contractor: BAM
Sector: Medical & Health
Steel: 650 te
Location: Bradford
Completed: 2015 – 2016

Alpamare Scarborough Water Park / The Sands Scarborough

Main Contractor: Tolent
Sector: Leisure
Steel: 250 te
Location: Scarborough
Completed: 2015 – 2016

Sabic Teesside Gas Conversion Project / Gas Cracker Phase 1

Main Contractor: Jacobs UK
Sector: Petrochemical, Oil & Gas
Steel: 200 te
Location: Teesside
Completed: 2015 – 2016

New Acrylamide Manufacturing Facility / BioACM Production Facility

Main Contractor: BASF 
Sector: Industrial / Petrochemical
Steel: 250 te
Location: Bradford
Completed: 2015

London City Airport –
West Pier Extension
 

Main Contractor:London City Airport
Sector: Aviation
Steel: 380 te
Location: London
Completed: 2015 – 2016

Buncefield Rebuild –
Access Platforms and Pipe Support Racking

Main Contractor: Trant Engineering
Sector: Industrial / Petrochemical
Steel: 200 te
Location: Hemel Hempstead
Completed: 2015

BAE Systems Building 430 Phase 2 Extension, Samlesbury Aerodrome

Main Contractor: ISG
Sector: Infrastructure
Steel: 450 te
Location: Blackburn
Completed: 2015 – 2016

Heathrow Terminal 3
Temporary Flight Connection Centre (FCC)

Main Contractor: Mace Ltd
Sector: Aviation
Steel: 400 te
Location: London
Completed: 2014 – 2015

Hiscox Building/
The Weave,
York

Main Contractor: BAM
Sector: Commercial
Steel: 150 te
Location: York
Completed: 2014 – 2015

Metropolitan Police Services (MPS) – Training & Operations Facility

Main Contractor: Mace Ltd
Sector: Infrastructure
Steel: 250 te
Location: Hendon, London
Completed: 2014