Project Summary
Our scope included seven freestanding structures on the live site:
Main Plant 5.1: a five-storey open structure including lifting beams, steel stairs, open grating, ladders, and fire proofing (by others).
Horizontal Tank Access Platform: a single 8 by 4 metre platform, 6.5 metres high, constructed above a new tank vessel.
Large Pipebridge: L-shaped pipebridge, the longest section spanning 18 metres.
Small Pipebridge: 11.5 metre structure including ladder and elevated walkway, to connect to the new Main Plant.
South Pipebridge: a 6 metre high peipebridge, spanning over 11 metres.
High Level Access Structure: a four-storey open steel access stair structure, providing high level access to tanks.
Electrical Sub Station: fully-clad building with 7 by 12 metre footprint, including Kingspan composite metal deck, steel personnel doors, and two external exposed access platforms with stairs.
Following completion of our steelwork installation, we further provided lifting and installation of approximately 30 number vessels and equipment items.